K Team Minutes
Client Meeting, 31st March 1999
|
| Attendees: |
Joanna Araminta, Joel Brakey, Michael Hart, Steve Goschnick |
| Apologies: |
Victor Leung, Dean Cortinovis, Long Tang, Anthony Senyard |
This Meeting
- Distributed draft of MOU (Memorandum of Understanding)
- Steve does not have coding standards yet, will distribute them soon.
- Some design and requirements issues resolved:
- For applet, all AI is within applet
- Application will communicate with servlet with exact relationship yet to be resolved
- Applet has minimal interface - 4 hands on screen, about 590 * 420 size
- Application will have everything inc. wall on screen, 800 * 600 size (larger if necessary)
- Include flowers as an option
- Instead of halting game, have a minimum time for pong, chi, etc.
- Allow undo when 3 AI opponents
- Allow people to upload their own pictures
- Top Ten score list
- Save game option when 3 AI opponents
- Sound effects (to be provided by Steve)
- Steve will provide more detail for the protocol to be used
- Terminology to be used is the same as in the instruction book in possession by Joel
- Come up with brief sketches for prototypes to show Steve by next client meeting
Next Meeting
- Joel will try and organise next client meeting for 15/3
|
Client Minutes Team Minutes